The Septic Field Saga – Part 3

Part 3 and hopefully the final chapter for another 30+ years.

After detecting the problem in 2013 and doing the first half in 2014, it’s time to finish of the job.

Pipes 3 & 4 get dug up and replaced. Scott & Eric were a huge help and made the job go so much faster and it’s always fun working alongside the guys on a project.

Scott & Eric hard at work on a Lake Project

Scott & Eric hard at work on a Lake Project

After the dig & dispose, we made a trip into town for a few pipe parts, and a stop at the Chip Truck.  Once back on the job site the new pipes were assembled,  connected up to the system and then covered over. Repair complete.  Well, almost. The next weekend I re-assembled the walkway to the stairs and sometime this summer we should consider some topsoil and grass seed to put the lawn back in place.

1 thought on “The Septic Field Saga – Part 3”

Leave a Reply